Check out some of our past projects in marine and on-land engineering.
The ramp system is the most critical part as it ensures the safe and smooth transportation of heavy equipment. We conducted a strength analysis test to ensure the ramps are able to withstand the heavy load.
A safe and pre-planned process of removing existing buildings and structures to make way for newer builds. The length of time it takes for a building to be demolished, depending on scale and complexity. Click to see our process on tearing down this old factory.
Where we carry out the refurbishment, design and installation of foam firefighting systems -- with a focus on design flexibility, lead time reduction and field usability. Click on the button to view pictures from this completed project.